‘Buy cheap, buy twice.’ It’s a phrase we’re all familiar with. But in this article, we explore why there’s no reason to settle for short-term pain in the first place. When cost-effectiveness DOESN’T sacrifice quality, that’s what we refer to as a no brainer, right?
So, why in so many walks of life are there a ‘This is how it’s always been done…’ approach? When an open mind and alternative products and/or methods can make for a more efficient and cost-effective outcome.
In the world of ironwork seating, SHIMPAC® SYSTEMS brings the challenge to what is an all-too-common thought.
“It’s about a long-term approach,” says SHIMPAC® SYSTEMS General Manager Barry Andrews. “Our system has the all-important low installation cost. Rightly or wrongly, we know there will be a certain percentage of those looking for a solution will decide based purely on cost. So, to make sure we provide cost-effectiveness is vital, and we’re proud to say using SHIMPAC® SYSTEMS saves a minimum of 40% for the same ironwork seating installation using other compliant products. Additionally, SHIMPAC® SYSTEMS products are the only materials that have consistently been used to gain product assurance certification (HAPAS/PAS) covering ironwork installations.”

“However,” Barry continued, “Far beyond install cost, the SHIMPAC® SYSTEMS system provides a long lasting, durable solution that reduces the need for repair and in turn, reduces the need for labour, material and lane closure costs amongst other unnecessary financial costs.
“Ultimately, the system provides a more sustainable solution in terms of finance, safety and asset life.” Barry commented.
Typically, the unnecessary costs Barry mentions can include:
- Temporary TM: £550 – £850.00 per day depending on area. ‘A’ road costs include:
- Road closure (local roads): £500 per lane day
- Council administration: £100 per request for TM
- Traffic Lights (hire rates): £100 per day
- Traffic cones (hire rates): £2.50 each per week.
- Labour: £60.00 per hour
- Penalties: £200 per hour if road closure period exceeded
SHIMPAC® SYSTEMS deliver compression strength to 120 tonnes, beyond any strength provided by other comparable products. SHIMPAC® SYSTEMS introduce savings on time and installation quality and longevity of the install and when installed correctly, adjustment can be achieved to millimetre precision and there is also no requirement to cut engineering bricks.

Barry continued:
“In a perfect install with zero variables the difference between install costs using SHIMPAC® SYSTEMS and standard engineering bricks are negligible. But in trafficked areas, by replacing the final course of brickwork with SHIMPAC® SYSTEMS products, a stronger, longer lasting lintel is created, taking the forces and stresses that can be withstood to in excess of 120 tonnes.”
We asked Barry why he feels the industry often falls into the ‘This is how we’ve always done it’ mentality.
“Typically, people are creatures of habit, aren’t they?” said Barry.
“With that said, sometimes it’s just a lack of awareness. People don’t always know or fully understand the benefit of a system such as ours. Another approach is that people may only be in a role for a certain period of time, so perhaps it seems ‘less hassle’ to just do something a predecessor had in place. The danger there is that in the long run, the amount of money lost by contractors and local authorities, as well as time lost for works elsewhere due to repair demand, not to mention increased exposure to risk for workforces and the ‘we’ll just carry on doing it this way’ mindset becomes potentially very costly in more ways than one.”
To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range