Fines for roadworks that overrun apply to contractors

Avoiding Fines with Speed You Can Bank On – and Why It Matters Now More Than Ever

Utility companies and contractors across the UK now face a dramatically harsher enforcement environment when it comes to street works. Under recently updated government regulations, fines of up to £10,000 per day for overrunning scheduled works are no longer limited to weekdays – they now apply on weekends and bank holidays, too.

Fines for roadworks that overrun apply to contractors
Fines for roadworks that overrun apply to contractors

What’s more, fixed penalties for permit violations have been doubled to £1,000 for full charges, or £600 when discounted.

These reforms reflect the urgency with which the government is moving—ensuring roadworks are completed precisely and on time is now a serious business.

SHIMPAC® Transforms Installation Speed Into Real-World Savings

In this environment, speed isn’t just an advantage – it’s a necessity.

SHIMPAC® rises to the challenge with a system that delivers incredible efficiency, cutting installation time significantly compared to traditional methods.

Urgent repairs to local roads are required – and SHIMPAC® is ready to deliver
Urgent repairs to local roads are required – and SHIMPAC® is ready to deliver

The SHIMPAC® SYSTEM provides installation times of just 10–15 minutes per ironwork seating installation, with no mortar curing delay – unlike the multiple days required by mortar-based systems. In fact, roads can be safely reopened within 40 minutes of installation, even after a full-day closure.

As SHIMPAC®’s Technical Lead Barry Andrews puts it, this is more than just quick installation – it’s “probably the fastest, most cost-effective engineering solution.”

The SHIMPAC® SYSTEM brings durable, mm precision to ironwork seating and levelling with safe, one-person installation
The SHIMPAC® SYSTEM brings durable, mm precision to ironwork seating and levelling with safe, one-person installation

By slashing how long works occupy the road, SHIMPAC® helps contractors:

  • Avoid hefty daily fines
  • Minimise traffic disruption
  • Reduce public frustration

In effect, SHIMPAC® turns time saved into money saved – keeping projects compliant, efficient, and within budget.

20% of UK potholes are due to failed ironwork seating – the problem SHIMPAC® solves
20% of UK potholes are due to failed ironwork seating – the problem SHIMPAC® solves

Beyond Speed: Precision, Durability & Compliance

Speed, however, is only one part of the story. SHIMPAC® products also deliver:

  • Millimetre-level precision with ROADSHIMS® to ensure perfect alignment and prevent potholes caused by water ingress
  • Long-term durability, built to withstand rising HGV weight limits and avoid repeat interventions
  • Full regulatory compliance—HAPAS/PAS assurance, SROH alignment, and National Highways approval—ensuring every installation meets the highest standards
  • Removal of common Health & Safety risks from the installation process

Smart Solutions in a High-Stakes Regulatory Era

With the government doubling down on enforcement – including widening fines and tightening schemes – SHIMPAC® provides the technology and efficiency that projects now require.

UK roadworks are under new intense scrutiny. With SHIMPAC®, contractors and authorities have a clear path forward: faster, smarter, safer, and penalty-free.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Share:

Facebook
Twitter
Pinterest
LinkedIn