Categories
News

When More Mortar Isn’t the Answer – Rethinking the Future of Ironwork Seating

Thicker layers of flowable mortar sound logical when ironwork fails. But if the material cracks under load, does using more of it fix the underlying problem – or just repeat it?

There is a growing trend within the highways and civil engineering sectors towards the use of increased thicknesses of flowable mortars and similar materials when installing and reinstating ironwork.

On the face of it, the logic is understandable. If a traditional installation has failed, perhaps the answer is to use more material. A thicker layer should, in theory, provide greater strength, increased support and a more robust installation.

SHIMPAC® – rethinking the future of ironwork seating

But is more mortar really the answer?

SHIMPAC® believes the industry needs to take a step back and consider a fundamental question. If a material is already susceptible to cracking, shrinkage or failure under certain conditions, does increasing the amount of that material genuinely address the underlying problem – or does it simply provide more of the same?

This is not an argument against flowable mortars or any individual product. Mortar has an important role to play across the construction and highways industries and has been used successfully for decades.

The question is whether the industry should continue to rely increasingly heavily on mortar-based solutions to deliver the compressive and structural performance required of modern, heavily trafficked ironwork.

The answer may lie in rethinking the system itself.

The Changing Demands on the Network

The roads of today are not operating under the same conditions as those of previous generations.

Traffic volumes have increased. Heavy goods vehicles are heavier. In 2022, the maximum permitted weight of certain HGVs increased to 48 tonnes, placing additional demands on road infrastructure and the assets installed within it.

Ironwork seating systems must therefore withstand enormous forces generated every day by vehicles travelling over access covers, manholes and gully gratings.

At the same time, the UK is dealing with increasingly unpredictable weather, from prolonged rainfall to extreme temperature fluctuations and repeated freeze-thaw cycles. Water ingress, movement, poor installation and deterioration can all contribute to failure.

Against this backdrop, the question of how ironwork is seated and supported is becoming increasingly important.

Simply putting more material into the void and waiting for it to harden may not be enough.

The Problem With Doing More of the Same

There is an old definition of insanity often attributed to Albert Einstein – doing the same thing repeatedly and expecting a different result.

The highways industry should perhaps ask itself whether this principle has relevance when it comes to ironwork installation.

If a traditional installation fails because the supporting material has cracked, deteriorated or lost its integrity, then simply increasing the thickness of that same type of material may not necessarily solve the fundamental issue.

There are countless reasons why mortar-based installations can deteriorate. Shrinkage, cracking, water ingress, temperature fluctuations, poor preparation, movement and the stresses created by modern traffic can all play a part. The quality of installation and site conditions can also have a significant influence on performance.

The result is that a material intended to provide strength and support can ultimately become the weakest point in the installation.

When that happens, the consequences extend beyond the ironwork itself.

Movement can create gaps between the ironwork and the surrounding carriageway. Water can find its way into these gaps, penetrating beneath the road surface. Once water enters the structure, freeze-thaw cycles can accelerate deterioration, while repeated traffic loading continues to apply shear and compression forces.

Eventually, the cycle begins again.

A failed installation leads to a repair. The repair requires another road closure. Traffic management is reinstated. Operatives return to the carriageway. Materials are used. Budgets are spent.

A Different Approach to Ironwork Seating

SHIMPAC® takes a fundamentally different approach.

Rather than relying on increasing quantities of mortar to provide the primary seating and levelling solution, SHIMPAC® is a fully engineered system designed specifically to provide precise and durable support for ironwork.

The system uses ROADSHIMS® to achieve millimetre precision, allowing ironwork to be accurately positioned and aligned with the surrounding road surface.

An ironwork cover that is correctly aligned with the carriageway is not simply a matter of aesthetics. It is about ensuring that the forces generated by traffic are properly managed and that the installation is not subjected to unnecessary movement.

SHIMPAC® is engineered to provide long-term performance under the shear and compression forces generated by modern road traffic, helping to maintain the integrity of the installation throughout the life of the asset.

Less Reliance on Material – More Reliance on Engineering

The future of sustainable infrastructure cannot simply be about using more materials.

It must be about using the right materials in the right way, reducing waste and designing systems that last longer.

Every failed ironwork installation has a wider environmental and economic impact. Materials must be manufactured and transported. Traffic management must be installed. Vehicles must travel to site. Operatives must return to the carriageway. Further materials must be used to complete the repair.

The cycle continues.

SHIMPAC®’s approach is designed to break that cycle by providing an engineered system that is built for long-term performance.

When installed correctly, the system has demonstrated exceptional longevity, with the earliest installations now more than 35 years old and no reported failures. That is a very different proposition to a maintenance model that anticipates repeated intervention throughout the life of an asset.

The Real Measure of Sustainability

Sustainability is often discussed in terms of the materials used during an installation. But true sustainability should also consider how long that installation lasts.

A product that requires less material but fails repeatedly may ultimately have a greater environmental impact than a system that delivers long-term performance from the outset.

The same applies economically.

A cheaper installation that requires repeated maintenance may ultimately cost significantly more over its lifecycle than an engineered solution that lasts.

SHIMPAC® therefore believes the industry should be looking beyond the initial installation and considering the whole-life impact of ironwork seating, posing questions like:

  • How many times will the site need to be revisited?
  • How many times will traffic management need to be installed?
  • How many additional vehicles will need to travel to the location?
  • How many additional tonnes of material will be required?
  • How much labour will be spent repairing something that could have been engineered to last in the first place?

These, they believe are the questions that should shape the future of highway maintenance.

A Long-Term Solution for a Long-Term Problem

The highways industry needs solutions that reflect the realities of modern roads.

Increasing traffic loads, heavier vehicles, unpredictable weather and growing pressure on local authority budgets all demand a more considered approach to infrastructure maintenance.

SHIMPAC® does not suggest that mortar has no place in highway construction. Instead, it challenges the assumption that the answer to ironwork failure is always to use more of it.

Sometimes, the solution is not more material. It is better engineering.

Ultimately, if the industry continues to repair failed installations in the same way, using increasingly substantial quantities of materials that can themselves be vulnerable to cracking and deterioration, it should not be surprising when the same problems return.

The definition of insanity may be doing the same thing repeatedly and expecting a different result.

Perhaps the future of ironwork seating lies in doing something different.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

Extending Asset Life Through Smarter Maintenance

Across the UK’s highways network, local authorities and contractors face a constant balancing act.

Budgets remain under pressure, road user expectations continue to rise, and the demand for resilient infrastructure has never been greater. Against this backdrop, the challenge is not simply how to repair assets when they fail, but how to maximise their lifespan whilst minimising the cost and disruption associated with maintenance.

SHIMPAC® has long been recognised as a solution that helps achieve exactly that.

SHIMPAC® – extending asset life through smarter maintenance

As a fully engineered ironwork seating and levelling system, SHIMPAC® is designed to eliminate many of the common causes of premature ironwork failure.

Through exceptional durability and resistance to the immense shear and compression forces generated by modern traffic, SHIMPAC® enables local authorities and contractors to adopt a smarter approach to asset management.

The result is a two-fold benefit – reducing the need for future maintenance through correct installation from day one, whilst also providing the ideal solution when urgent maintenance interventions are required.

Prevention Over Cure: Maintenance Before It Happens

Every maintenance visit comes at a cost.

Whether it is labour, traffic management, road closures, machinery, materials or disruption to the travelling public, every return visit to a defect represents additional expenditure that could potentially have been avoided.

SHIMPAC® has been engineered specifically to break that cycle.

By ensuring ironwork is seated and levelled with millimetre precision, the system removes the movement that often leads to deterioration around covers and frames. This prevents the formation of gaps that allow water ingress, one of the primary causes of carriageway failure and pothole formation.

The long-term durability of SHIMPAC® means installations remain stable and effective throughout the road’s maintenance cycle and often well beyond. In fact, some of the earliest SHIMPAC® installations remain in service more than 35 years later.

For local authorities, this means fewer repeat visits, fewer emergency repairs and greater confidence that maintenance budgets are being invested wisely.

In short, SHIMPAC® significantly reduces the need for continued intervention by getting it right first time.

When Disaster Strikes: Urgent Maintenance

Of course, not every maintenance requirement can be prevented.

When emergency works or urgent interventions are required, speed becomes critical. Road closures must be kept to a minimum, disruption reduced and operatives protected from unnecessary exposure to live traffic.

This is another area where SHIMPAC® excels.

The system can be installed in a fraction of the time required by traditional methods, allowing roads to be reopened quickly and safely. With installation times measured in minutes rather than hours, maintenance teams can complete more work within available closure windows whilst reducing disruption for road users.

The speed of installation delivers important safety benefits. Less time spent working in the carriageway means reduced exposure to live traffic and fewer risks for operatives. Equally, shorter road closures reduce congestion and improve safety for the travelling public.

As local authorities continue to focus on network efficiency and contractor performance, solutions that reduce both duration of works and workforce exposure are becoming increasingly important.

Introducing READY-PAC™ – Where Convenience Meets Performance

Building on the proven success of the SHIMPAC® SYSTEM, the company is now undertaking a rollout of its READY-PAC™.

Designed with convenience and efficiency in mind, READY-PAC™ takes the simplicity of SHIMPAC® even further by providing pre-prepared packs of ROADSHIMS® ready for installation.

Each pack contains the appropriate ROADSHIMS® configuration required for a specific installation, removing the need for preparation work on site and allowing maintenance teams to work even more efficiently.

For emergency maintenance scenarios, this offers significant advantages. Operatives can arrive on site with everything prepared and ready to install, reducing delays, improving consistency and helping ensure that repairs are completed as quickly as possible.

Supporting Better Long-Term Outcomes

The highways sector increasingly demands solutions that deliver more than a temporary fix. Local authorities need products that protect budgets, improve safety, support sustainability objectives and maximise the lifespan of infrastructure assets.

SHIMPAC® delivers on all fronts.

By preventing failures and providing a rapid response solution when maintenance is required, SHIMPAC® supports a smarter approach to asset management.

In an industry where every minute, every pound and every closure matters, SHIMPAC® continues to demonstrate why prevention remains better than cure – whilst ensuring that when maintenance is needed, it can be delivered quickly, safely and effectively.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

Government Pothole Funding Crackdown: Smarter Spending Starts with Smarter Solutions

The Government’s announcement on 14 April sent a clear message to councils across the UK – pothole funding must deliver visible, measurable results, or future allocations could be at risk.

Under the new rules, local authorities that fail to demonstrate effective road maintenance may lose up to a third of next year’s highways funding, as ministers push for greater accountability and better outcomes for road users.

SHIMPAC® – smarter spending starts with smarter solutions

For local authorities already balancing rising costs, ageing assets and public pressure over road conditions, this creates a significant challenge. Budgets are under scrutiny, expectations are rising, and every pound spent must now work harder than ever before.

SHIMPAC® believes this shift in focus presents a real opportunity, because long term pothole reduction does not come from repeated reactive patching. It comes from tackling root causes.

One of the most overlooked contributors to potholes is ironwork failure.

Around 20% of potholes are linked to defective ironwork or ironwork seating, where movement, poor alignment and water ingress begin the cycle of deterioration. Covers and frames that are not properly supported create weak points in the carriageway, allowing water to penetrate the surface and accelerate failure, particularly during freeze thaw conditions and under modern traffic loading.

That means one fifth of the pothole problem can be directly addressed with better engineering.

Tackling the 20%

This is where SHIMPAC® provides a proven solution.

The fully engineered ironwork seating and levelling system is designed to eliminate movement, deliver millimetre precision alignment, and create maximum durability under shear and compression forces. By ensuring ironwork sits correctly and remains stable, SHIMPAC® helps remove one of the most common triggers of pothole formation before it develops.

For local authorities, the benefits are immediate and long term.

In the short term, SHIMPAC® protects budgets through faster installation times, lower labour requirements and reduced disruption. Works can be completed quickly and efficiently, helping councils deliver more repairs within existing funding envelopes.

In the long term, SHIMPAC® protects budgets by reducing repeat visits, emergency call outs and the endless cycle of patching the same failing locations. Instead of returning to the same defect 12 months later, authorities can redirect resources to wider network improvements, preventative maintenance and other frontline priorities.

Barry Andrews, SHIMPAC® Operations Manager, told us:

“At a time when councils are being asked to prove value for money, durability matters. Prevention matters. Whole life cost matters.

“If the Government wants better roads and taxpayers want better value, then addressing the 20% of potholes caused by ironwork defects is an obvious, quick, and extremely cost-effective way to start.”

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

SHIMPAC® Strengthens Northern Presence with Appointment of Matthew Tearney as Sales Manager

SHIMPAC® SYSTEMS has announced the appointment of Matthew Tearney as its new Sales Manager for the North of England and Scotland, marking a significant step in the company’s continued growth and commitment to strengthening its presence across key regions.

SHIMPAC® appoints Matthew Tearney as Sales Manager

With a strong and supportive management structure already in place, the addition of Matthew further enhances the company’s ability to deliver value, expertise and service to customers across the UK.

Matthew brings with him more than 35 years of experience across the civils and utilities landscape, working on everything from smaller scale projects through to multi million-pound tenders within the renewable energy and wind farm sectors for Tier 1 contractors. His extensive background also includes over a decade at Radius Systems, where he provided business support and account management across UK and European markets within power and telecoms portfolios.

During this time, Matthew played a key role in identifying and developing new business opportunities across telecoms, utilities and energy markets. His work has seen him collaborate with major operators, merchants, distributors, DNOs and contractors, while also securing tender opportunities with leading organisations including CityFibre, Virgin Media, BT and Gigaclear for large scale network build programmes. His deep understanding of market trends, pricing strategies and customer requirements positions him as a valuable addition to the SHIMPAC® team.

In his new role, Matthew will be responsible for managing, maintaining and growing sales of SHIMPAC® products across the North of England and Scotland. This includes delivering product information, training and education to contractors, merchants and apprentices, ensuring a clear understanding of the benefits and performance of SHIMPAC® SYSTEMS.

A key part of his remit will also be to maintain and further enhance the SHIMPAC® brand, which is widely recognised as a leading solution for ironwork seating and levelling.

Speaking about his new role, Matthew said,

“I am looking forward to this challenge working alongside John Griffiths and the rest of the SHIMPAC® team. I bring industry experience and an extensive list of contacts within the relevant market sectors.”

John Griffiths added,

“I’m looking forward to working with Matt. I know that our Northern customers are in good hands and we look forward to seeing many of them over the next few months.”

Barry Andrews, Technical Lead at SHIMPAC® also welcomed the appointment, commenting,

“I was so pleased that Matt wished to join us, and I know that he will be a valued addition to our management structure. He brings a wealth of industry knowledge and experience, some of which is in markets that offer a new challenge for us. Matt’s addition increases the industry experience across the SHIMPAC® management structure to well over 100 years. That is great news which benefits our customers further. I look forward to working with him over the coming years.”

As SHIMPAC® continues to grow its footprint across the UK, this appointment reinforces its commitment to delivering expertise, innovation and support to its customers.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

Weathering the Storm: Why precision ironwork installation matters more than ever…

Across the UK, local authorities are once again dealing with the after-effects of extreme weather.

SHIMPAC® – weathering the storm

Recent storms, prolonged heavy rainfall and spells of sub-zero temperatures have placed renewed strain on an already fragile road network.

While seasonal variation has always been a factor in highways maintenance, increasingly irregular and severe weather patterns are becoming a persistent threat to the long-term quality and resilience of UK roads.

One of the most visible and costly consequences is the rapid formation of potholes.

Freeze thaw cycles allow water to penetrate weaknesses in the road surface, expand as temperatures drop, and break apart surrounding material. What is often less visible, but just as significant, is the role of ironwork failure in this process. Around 20 percent of UK potholes are centred on ironwork, where poor alignment and inadequate support create gaps that allow water ingress and accelerate deterioration.

These gaps around covers and frames act as entry points for water, traffic loading and movement. Once water finds its way in, the damage compounds quickly, particularly during cold spells when freezing causes expansion beneath the surface.

The result is recurring defects, repeat repairs and a cycle of reactive maintenance that places pressure on already stretched budgets.

This is where installation accuracy becomes critical.

SHIMPAC® addresses the root cause of ironwork related failure by delivering millimetre precision and consistency during installation. By bringing ironwork perfectly flush with the surrounding road surface, SHIMPAC® removes the gap where water can take hold and undermine the structure below. With no void for ingress, the risks associated with freeze thaw damage are significantly reduced.

Beyond alignment, the SHIMPAC® solution is designed to perform under the realities of the UK network.

It offers maximum durability under both shear and compression forces, maintaining integrity even during extreme weather events. Whether facing prolonged rainfall or heavy traffic loading, the system provides a stable and resilient outcome that stands up to year-round conditions.

As local authorities look ahead, the challenge is no longer just repairing damage but breaking the cycle of deterioration.

With unpredictable weather now an annual certainty rather than an exception, solutions that extend asset life and reduce repeat interventions are essential.

By addressing ironwork failure at its source, SHIMPAC® helps authorities move away from short term fixes and towards a more sustainable approach to road maintenance, an approach that is built to withstand whatever the UK weather delivers next.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

The Winter Maintenance Solution Built for Performance, Efficiency and Environmental Responsibility

As winter approaches and temperatures begin to fall, local authorities face increasing pressure to keep networks safe, open and resilient.

SHIMPAC® – the winter maintenance solution

Cold weather creates challenging working conditions and exposes weaknesses in road infrastructure, particularly around ironwork, which remains one of the most common points of failure on the network.

The winter maintenance cycle demands rapid inspections, quick interventions, limited working windows and minimal disruption to road users. SHIMPAC® offers a clear advantage in all of these areas. Its engineered system for seating and levelling ironwork is proven, reliable and widely trusted throughout the UK’s highways sector, making it ideally suited to the most demanding seasonal conditions.

One of the reasons SHIMPAC® stands out during winter is its ability to perform consistently in low temperatures.

Where traditional materials can become brittle, difficult to manage or prone to failure in cold weather, SHIMPAC® remains stable and effective. This allows winter maintenance teams to carry out essential work without waiting for warmer conditions, reducing delays and preventing further deterioration caused by frost, water ingress and freeze–thaw movement. Its reliability ensures that ironwork installations remain secure and long-lasting even when subjected to severe winter stresses.

Another key advantage during the winter season is the absence of curing time. SHIMPAC® products can be trafficked immediately after installation, giving contractors and authorities the ability to complete works quickly and reopen the network without delay.

This is particularly important during winter, when every extra minute of road closure increases congestion, raises risk for workers and road users, and complicates the wider maintenance programme. Immediate trafficking means reduced traffic management requirements, shorter working windows, and less disruption at a time of year when the network is already under strain.

The environmental benefit is equally significant. Local authorities across the UK are working to meet ambitious carbon reduction targets, and winter maintenance operations traditionally carry some of the highest emissions due to repeat visits, extended closures and increased vehicle use. SHIMPAC® supports sustainability by reducing the time spent on site, eliminating unnecessary return visits thanks to its long life expectancy, and avoiding the need for heavy or energy-intensive equipment.

Operational efficiency is also improved. Winter maintenance budgets are notoriously tight, with unexpected failures and emergency works placing strain on resources.

Because SHIMPAC® is simple to use, lightweight and requires no specialist machinery, teams can complete works far faster than with traditional methods. This efficiency is invaluable in winter, when daylight hours are limited, weather windows close quickly and labour resources are often stretched.

Winter places unique stress on roads, with freeze–thaw cycles causing movement, creating cracks and accelerating the breakdown of poorly supported ironwork. SHIMPAC® is engineered to support ironwork throughout the full maintenance cycle and often far beyond, ensuring that installations do not fail during the winter months when emergency repairs are most difficult.

The nationwide availability of SHIMPAC® through established civils merchants further strengthens its suitability for winter maintenance. Local authorities and contractors can access stock quickly and reliably, avoiding delays caused by long lead times or supply shortages.

With winter defects rising rapidly once temperatures drop, having a dependable and readily accessible solution is essential for ensuring a smooth, responsive maintenance programme.

Ultimately, SHIMPAC® aligns perfectly with the broader environmental and operational goals of local authorities. Winter maintenance now plays an important role in reducing emissions, improving network resilience, managing budgets responsibly, and delivering safe, reliable roads for communities. SHIMPAC® supports all of these aims by offering a system that is fast, durable, sustainable and dependable in even the harshest winter conditions.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

The Best Practice Solution for Avoiding Overrunning Roadworks Fines for Contractors and Authorities

The regulatory landscape for roadworks in the UK has changed dramatically.

SHIMPAC® – avoiding overrunning roadworks fines

In a bid to tackle disruption, the government has rolled out tougher measures designed to hold contractors and authorities accountable for delays. Fines for overrunning projects now stretch beyond weekdays and apply to weekends and bank holidays too, with penalties as high as £10,000 per day.

Fixed penalties for permit breaches have doubled, adding yet another layer of financial risk to projects that run behind schedule.

In this environment, time really is money.

With public frustration about congestion at an all-time high, authorities have made it clear that they will not tolerate drawn-out roadworks. The message is simple: deliver on time, or pay the price.

So how can contractors and local authorities ensure they meet deadlines, keep roads open, and avoid these costly fines?

The answer lies in best practice – and at the heart of that best practice is SHIMPAC®, the fully engineered system for ironwork seating and levelling.

The High Stakes of Overrunning

Roadworks are, by their nature, disruptive. But overruns make matters worse, compounding congestion and shaking public confidence in those responsible.

The government’s new measures do not just penalise lateness; they signal a cultural shift. Road authorities want projects completed faster, safer, and smarter – and they are prepared to financially penalise anyone who does not meet that standard.

Ironwork installations – manholes, gully gratings, access covers – may only make up a small percentage of a project, but their impact is disproportionately large.

Traditional seating and levelling methods can be slow, complex, and prone to failure. Delays caused by mortar curing times, heavy machinery requirements, or subsequent remedial works can all drag a project past its deadline. And when the fines start stacking up, those ‘minor’ delays become very expensive mistakes.

This is where SHIMPAC® changes the game.

SHIMPAC® Best Practice: The Engineered Solution

SHIMPAC® is not just a product. It is a best practice approach to ironwork installations – an engineered system that addresses the very challenges causing overruns and failures.

Every aspect of SHIMPAC® has been designed with speed, safety, precision, and longevity in mind. For contractors and authorities navigating today’s high-stakes environment, adopting SHIMPAC® is not just about efficiency – it is about compliance, risk reduction, and protecting budgets.

Here is why SHIMPAC® should be considered essential for best practice in roadworks.

  1. Four Times Faster: Minimising Road Closure Times

Perhaps the most important factor in avoiding overrun fines is speed. SHIMPAC® delivers the shortest road closure times of any ironwork seating product, completing installations up to four times faster than traditional methods.

Where mortar-based systems require 6 – 7 days to cure fully, SHIMPAC® eradicates that wait time entirely. With a 10 – 15-minute installation process, roads can be reopened safely within the same day – a fraction of the time required by alternatives.

For contractors, that means more ironwork can be completed within a one-day closure. For the public, it means less disruption. And for authorities, it means deadlines are met and fines are avoided.

Speed is not just a USP for SHIMPAC® – it is a lifeline in a regulatory system where overruns carry serious financial consequences.

  1. A Third of the Cost: Smarter Budget Management

Budget constraints are nothing new for local authorities. The challenge has always been to deliver high-quality infrastructure solutions at the best possible value. SHIMPAC® provides that value by being around a third of the cost of alternative ironwork seating solutions.

But the savings go beyond upfront costs by providing:

  • Reduced labour costs: SHIMPAC® can be installed by a single operative, freeing up crews for other work.
  • Fewer remedial works: With unmatched durability, SHIMPAC® reduces the need for maintenance visits, cutting long-term expenditure.
  • Avoidance of fines: Every day saved on a project is a day without a penalty fee attached.

In other words, SHIMPAC® protects budgets both in the short and long term, a crucial advantage for contractors and authorities navigating rising costs across the industry.

  1. Simplicity: User-Friendly, No Specialist Training

Complexity often leads to delays. Systems that require extensive training, heavy machinery, or specialist expertise inevitably slow down projects. SHIMPAC® flips that model by being simple and intuitive to use with:

  • No heavy or dangerous machinery required – just straightforward, practical installation.
  • Minimal training needed, reducing preparation time.
  • Pre-prepared Ready Pacs available, with everything cut to size and ready to install, further simplifying the process.

This simplicity not only keeps projects moving quickly but also reduces the likelihood of errors – errors which could otherwise lead to costly rework and delays.

  1. Designed for Safety: On Site and On the Road

Safety is a further key element of best practice – and SHIMPAC® is designed with safety at its core.

For operatives:

  • Installations can be completed by one or two people without reliance on heavy, dangerous equipment.
  • The reduced need for extended closures means less exposure to live traffic environments.

For road users:

  • SHIMPAC® provides millimetre precision in ironwork seating, eliminating hazardous uneven surfaces around ironwork
  • The system’s durability ensures that once installed, ironwork remains safe and reliable for years.
  • For active travellers, such as cyclists, the smooth transitions achieved with SHIMPAC® eliminate the risks associated with raised or sunken covers.

Best practice means not only delivering a project quickly but ensuring it is safe for everyone. SHIMPAC® meets both demands in full.

  1. Longevity: Lasts a Lifetime

One of SHIMPAC®’s most remarkable qualities is its longevity.

When installed correctly, SHIMPAC® lasts the full maintenance cycle of the road surface – and often beyond. In fact, some of the earliest installations, over 35 years old, remain in service today with no reported failures.

That longevity translates directly into fewer return visits, fewer road closures, and fewer opportunities for overruns.

By removing the need for repeat interventions, SHIMPAC® not only saves time and money but also protects the public from the frustration of repeated works at the same location.

In a world where fines punish delays and overruns, longevity is more than a benefit – it is a shield against risk.

SHIMPAC® and Best Practice: A Clear Path to Compliance

The concept of ‘best practice’ in roadworks is not just about doing things better – it is about compliance, accountability, and reputation. Authorities and contractors are now judged not only on the quality of their work but also on their ability to deliver it on time, without disruption.

By integrating SHIMPAC® into their processes, contractors and authorities align themselves with a proven best practice that ticks every box:

  • Speed (avoiding overruns and penalties)
  • Cost efficiency (short-term and long-term savings)
  • Simplicity (keeping teams efficient and effective)
  • Safety (for operatives and road users alike)
  • Longevity (lasting infrastructure that reduces repeat interventions)

With penalties escalating and public expectations rising, there has never been a better – or more necessary – time to adopt SHIMPAC®.

Avoid Fines, Deliver Best Practice

Roadwork overruns are no longer a minor inconvenience. They are a financial and reputational risk that contractors and authorities cannot afford to ignore. The government’s tougher stance makes one thing clear: only those who embrace best practice will thrive.

With a system that is four times faster, a third of the cost, safer, simpler, and longer-lasting than alternatives, it offers contractors and authorities the perfect solution to deliver projects on time, on budget, and without penalty. SHIMPAC® provides that best practice.

Contractors and Authorities – take note.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

Avoiding Fines with Speed You Can Bank On – and Why It Matters Now More Than Ever

Utility companies and contractors across the UK now face a dramatically harsher enforcement environment when it comes to street works. Under recently updated government regulations, fines of up to £10,000 per day for overrunning scheduled works are no longer limited to weekdays – they now apply on weekends and bank holidays, too.

Fines for roadworks that overrun apply to contractors
Fines for roadworks that overrun apply to contractors

What’s more, fixed penalties for permit violations have been doubled to £1,000 for full charges, or £600 when discounted.

These reforms reflect the urgency with which the government is moving—ensuring roadworks are completed precisely and on time is now a serious business.

SHIMPAC® Transforms Installation Speed Into Real-World Savings

In this environment, speed isn’t just an advantage – it’s a necessity.

SHIMPAC® rises to the challenge with a system that delivers incredible efficiency, cutting installation time significantly compared to traditional methods.

Urgent repairs to local roads are required – and SHIMPAC® is ready to deliver
Urgent repairs to local roads are required – and SHIMPAC® is ready to deliver

The SHIMPAC® SYSTEM provides installation times of just 10–15 minutes per ironwork seating installation, with no mortar curing delay – unlike the multiple days required by mortar-based systems. In fact, roads can be safely reopened within 40 minutes of installation, even after a full-day closure.

As SHIMPAC®’s Technical Lead Barry Andrews puts it, this is more than just quick installation – it’s “probably the fastest, most cost-effective engineering solution.”

The SHIMPAC® SYSTEM brings durable, mm precision to ironwork seating and levelling with safe, one-person installation
The SHIMPAC® SYSTEM brings durable, mm precision to ironwork seating and levelling with safe, one-person installation

By slashing how long works occupy the road, SHIMPAC® helps contractors:

  • Avoid hefty daily fines
  • Minimise traffic disruption
  • Reduce public frustration

In effect, SHIMPAC® turns time saved into money saved – keeping projects compliant, efficient, and within budget.

20% of UK potholes are due to failed ironwork seating – the problem SHIMPAC® solves
20% of UK potholes are due to failed ironwork seating – the problem SHIMPAC® solves

Beyond Speed: Precision, Durability & Compliance

Speed, however, is only one part of the story. SHIMPAC® products also deliver:

  • Millimetre-level precision with ROADSHIMS® to ensure perfect alignment and prevent potholes caused by water ingress
  • Long-term durability, built to withstand rising HGV weight limits and avoid repeat interventions
  • Full regulatory compliance—HAPAS/PAS assurance, SROH alignment, and National Highways approval—ensuring every installation meets the highest standards
  • Removal of common Health & Safety risks from the installation process

Smart Solutions in a High-Stakes Regulatory Era

With the government doubling down on enforcement – including widening fines and tightening schemes – SHIMPAC® provides the technology and efficiency that projects now require.

UK roadworks are under new intense scrutiny. With SHIMPAC®, contractors and authorities have a clear path forward: faster, smarter, safer, and penalty-free.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

Tackling the 20: Helping to Save Lives by Improving Road Conditions

Road safety is a national priority, yet the condition of the UK’s road network continues to contribute to tragic and avoidable loss of life.

SHIMPAC® – helping to save lives by improving road conditions

Shockingly, 15 people die every single day on our roads as a direct result of poor conditions. Among the contributing factors, potholes remain one of the most persistent and dangerous issues, and failed ironwork is a key part of the problem.

According to industry data, 20% of potholes are caused by failed or sunken ironwork.

Whether due to inadequate seating systems, poor installation methods, or the sheer weight of modern traffic, ironwork that deteriorates over time leads to surface weakness, water ingress, and ultimately, the potholes that are both a safety hazard and a financial burden.

SHIMPAC® ROADSHIMS® in different sizes

Enter SHIMPAC®

A fully engineered system designed to eradicate the root cause, the SHIMPAC® SYSTEM, ensures ironwork failures can be dramatically reduced – even eliminated.

Its patented ROADSHIMS® and GULLY COLLARS ™ deliver unmatched strength, longevity, and precision, ensuring ironwork installations remain intact and level with the surrounding surface. That stability not only prevents water from penetrating beneath the road surface but also removes the conditions that lead to pothole formation.

The SHIMPAC® SYSTEM in situ
The SHIMPAC® SYSTEM in situ

This means fewer hazards, smoother roads, and, crucially, fewer accidents.

By directly addressing the cause of one in five potholes, SHIMPAC® has the potential to reduce road-related fatalities by up to 20% in that category. That’s three lives saved every day – a powerful figure that underlines the system’s value beyond cost or convenience.

SHIMPAC® is more than an efficient engineering solution – it’s a step toward safer roads for all.

mm precision of SHIMPAC® brings ironwork perfectly in line with the road surface
mm precision of SHIMPAC® brings ironwork perfectly in line with the road surface

A fully compliant, proven system that lasts a lifetime, cuts disruption, and gives local authorities the confidence that their roads are built to withstand modern pressures and protect those who use them.

Barry Andrews, SHIMPAC®’s Technical Lead, told us:

“When the right products are chosen at the beginning of a scheme, we’re not just saving budgets; We’re saving lives. It really is that simple.

“Roads that have deteriorated to a certain level go beyond simply being an inconvenience – they become a passive threat to safety and, in the worst eventuality, to life.

“The fact that there is a solution to eradicate this threat from 20% of all potholes means that there is a choice to be made. We can reduce deaths on our roads. We can reduce accidents on our roads.

“Ultimately, if we truly want the pothole-related death and accident toll on our roads to reduce, it’s something that can be opted for.”

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

A Responsible Approach to Infrastructure Through CSR

In an age where corporate accountability is under greater scrutiny than ever, SHIMPAC® stands as a beacon of Corporate Social Responsibility (CSR) – offering not just engineering excellence, but a socially and environmentally conscious approach to highway maintenance and utility works.

SHIMPAC® – a responsible approach to infrastructure through CSR

CSR isn’t just a checkbox exercise for SHIMPAC®. It’s embedded in every stage of the product lifecycle – from sourcing and specification, to performance in the real world and the wider societal benefits it brings.

Responsibility Engineered

At the heart of SHIMPAC®’s system lies a commitment to quality, compliance and consistency. Every component is selected and manufactured to the highest standards:

  • ROADSHIMS® are sized specifically to the ironwork to avoid unnecessary waste.
  • Bricks used are Class B engineering bricks, robust and long-lasting.
  • Mortars used are fast-set, aligning with BS 7903:2020, CD534, and the New Roads & Street Works Act (NRSWA).

This value-added specification doesn’t just ensure superior performance – it also ensures minimal material waste, greater durability, and long-term asset integrity.

Better Roads, Longer Life, Lower Impact

SHIMPAC®’s system delivers millimetre precision seating and levelling that is built to last the life of the ironwork asset. That longevity helps eliminate the need for unsightly patchwork repairs – keeping road surfaces flatter, cleaner, and safer for longer.

And because installations remain sound for years, local authorities and contractors aren’t called back to the same site 18 months later. That’s more than simply a cost saving – it’s a true social benefit.

Redirecting Resources Where They’re Needed Most

Fewer return visits mean fewer road closures, fewer disruptions, and less reallocation of limited local authority budgets.

In turn, the savings achieved through SHIMPAC® can be reallocated – whether it’s towards improving other deteriorating road sections, investing in social care, or funding community development projects.

When maintenance money isn’t spent on repeated repairs, it’s freed up for issues that make a difference to people’s daily lives.

This is CSR in action – engineering smarter to benefit wider society.

Speed = Social Good

SHIMPAC®’s installation is 3x faster than traditional methods, allowing more work to be done in a single road closure and roads to reopen in as little as 40 minutes after installation. That means:

  • Less traffic congestion
  • Fewer emissions from idling vehicles
  • Safer environments for road users and workers alike

These benefits go beyond the technical. They contribute to environmental responsibility, public safety, and community satisfaction – all key CSR pillars.

Long-Term Solution for Long-Term Impact

SHIMPAC® proves that socially responsible infrastructure doesn’t have to mean high costs or compromises. In fact, it often means better value, greater performance, and enhanced outcomes for both public bodies and the communities they serve.

CSR is ultimately about businesses taking ownership of their impact – and SHIMPAC® is proud to offer a system that doesn’t just fix the road, but plays a part in improving the bigger picture.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

A UK-Manufactured, Tariff-Proof Solution Amid Rising Global Costs

As global markets react to shifting trade policies and political tensions, businesses across the highways, utilities and construction sectors are feeling the pinch.

Import tariffs and supply chain disruptions are causing material prices to skyrocket – some by as much as a staggering 300%.

SHIMPAC® – a UK-manufactured, tariff-proof solution

For those relying on overseas products for ironwork seating and levelling, the financial impact is immediate and severe.

SHIMPAC® offers a reliable, UK-manufactured alternative – free from the uncertainty of international tariffs, with a commitment to fair, stable pricing.

Tariff-Free, Risk-Free Supply

As a result of being sourced and manufactured entirely in the UK, SHIMPAC® materials are not subject to global tariffs at any stage of the supply chain.

Where other systems may face unpredictable cost increases, delays at customs, and fluctuations in pricing due to overseas manufacturing and transport, SHIMPAC® remains stable, accessible, and dependable.

With no reliance on imported components, clients are shielded from trade policy changes and can move forward with confidence, not contingency plans.

Fair Pricing in a Volatile Market

While many materials have seen dramatic price increases, SHIMPAC® aims to keep any price movement below the rate of inflation. Whilst not always achievable, having full control of the supply chain – from sourcing, to manufacturing, through to delivery – puts SHIMPAC® in a strong position to offer best value.

The company’s UK base means:

  • No import tariffs
  • No customs delays
  • Shorter lead times
  • Transparent, predictable costs

In today’s climate, that level of control and reliability is not just desirable – it’s essential.

Budget-Friendly Without Cutting Corners

SHIMPAC® proves that cost-effective doesn’t have to mean compromise. In fact, it bucks the trend of ‘cheaper’ meaning lower quality.

Compared to traditional or imported seating systems:

  • Installation is around 40% cheaper
  • Labour costs are reduced with a one-man installation
  • Roads can reopen within 40 minutes
  • Minimal maintenance is needed thanks to long-term durability

In a World of Rising Costs, SHIMPAC® Stays Grounded

As imported systems become less predictable and more expensive, SHIMPAC® remains a constant – a British-made product offering smart engineering, rapid installation, long-term durability, and protection from global price volatility.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range

Categories
News

The Speedy Solution to Avoid Roadwork Fines

With new government penalties now in place for utility companies delaying roadworks, speed has never been more critical.

SHIMPAC® – the speedy solution to avoid roadwork fines

Slow or overrun projects could see contractors hit with fines of up to £10,000 per day, adding immense pressure to complete works efficiently. This is where SHIMPAC® provides a vital solution – its unrivalled installation speed is a game-changer, helping contractors avoid delays, reduce disruption, and keep costs under control.

Speed: The Ultimate Weapon Against Fines

Traditional ironwork seating solutions often rely on mortar-based methods, requiring a number of days for full curing. These lengthy installation times not only slow projects down but also increase the risk of costly overruns. SHIMPAC®, however, completely transforms the process.

“Over the years we have engineered and developed SHIMPAC® SYSTEMS products to deliver a number of major benefits to Highways Authorities, Contractors and Road users alike.”

“Speed is one of those key benefits, with our products enabling one-day road closures, SHIMPAC®’s 10-15 minute installation time means more ironwork seating can be installed and/or maintained,” explains Peter Rieck.

“Our speed benefits have always been of benefit to a contractor, local authority and road user, as roads are back in full use quicker, reducing disruption. SHIMPAC® is probably the fastest, cost-effective, engineering solution.”

“Now, there’s an even greater benefit to contractors utilising our system – avoiding the government’s recently announced financial penalties for roadworks overrunning.”

With SHIMPAC®, ironwork installations can be safely trafficked within just 40 minutes, meaning lane closures are drastically reduced, road user disruption is minimised, and projects are completed well within timeframes – keeping contractors and local authorities clear of financial penalties.

Reducing the Risk of Lane Rental Charges

With new regulations holding utility companies accountable for roadwork delays, lane rental schemes are becoming an increasing financial burden.

The faster a contractor can get a road reopened, the lower the overall costs. SHIMPAC®’s rapid installation process ensures that:

  • Lanes are reopened significantly faster than traditional methods.
  • Correctly installed SHIMPAC® SYSTEMS allow traffic to return in just 40 minutes.
  • Worksites are cleared more efficiently, minimising congestion and public complaints.

Cost Efficiency Through Speed and Simplicity

SHIMPAC®’s speed not only prevents fines but also delivers huge cost savings across the board.

SHIMPAC® SYSTEM’s extensive range of products are designed to match all available commercial ironwork, are engineered for safety doing away with cutting equipment and avoid the necessity for heavy lifting machinery, making installations a one-man operation. Not only do they reduce labour costs and mortar curing times are cut significantly – just 15 minutes for fast-set mortar, rather than days – but they also cut road closure times further reducing risk to employees and alleviating road user frustration.

VISIT SHIMPAC®

The SHIMPAC® SYSTEM also eliminates the need for repeat site visits, reducing vehicle movements and resource costs. This, alongside showing as much as or more than 60% total cost savings over alternative ironwork seating solutions.

By removing unnecessary delays, SHIMPAC® ensures projects remain within budget while meeting the new compliance standards that demand efficiency.

Durability: Eliminating the Need for Costly Reworks

A fast installation is only part of the equation – SHIMPAC® is also engineered to last.

Unlike traditional systems that can fail under extreme traffic loads, SHIMPAC® is designed to withstand even the most extreme pressures (tested independently to F900 Class ironwork standards and beyond). Installed correctly SHIMPAC® SYSTEMS ROADSHIMS® take the increasing pressures of 48-tonne HGVs in their stride, keeping roads intact for decades rather than years. This durability eliminates the need for expensive reworks or emergency repairs, and allowing the contractor to increase their productivity handling more installations quicker, further supporting compliance with government efficiency targets.

Precision Engineering: The Key to Long-Term Performance

SHIMPAC®’s ROADSHIMS® enable mm precision, ensuring ironwork is perfectly level with the road surface. This prevents failures caused by movement, eliminates water ingress, and significantly extends the lifespan of installations.

With SHIMPAC®, road surfaces remain smooth, potholes are prevented, and contractors avoid repeat fines for substandard work.

Avoiding Fines: The Smartest Choice for Utility and Roadwork Contractors

With the government enforcing stricter rules on roadwork delays, choosing SHIMPAC® isn’t just an efficiency decision – it’s one of financial necessity. Contractors using SHIMPAC® benefit from:

  • Faster installations – 10-15 minutes per unit
  • Roads reopened within 40 minutes
  • Fewer lane rental fees and overrun fines
  • Drastically reduced labour and resource costs
  • A durable system that eliminates the need for repeat repairs

For utility companies and contractors facing increasing scrutiny and financial penalties, SHIMPAC® offers the fastest, most cost-effective solution. With unmatched speed, precision, and durability, it’s the smart choice for those who want to stay ahead of the game.

To find out more about SHIMPAC® SYSTEMS and its full product range for all types and size of ironwork visit: Shimpac product range